Dam Neck BEQ

Virginia Beach, VA


Client

U.S. Navy

Architect

Stanmyre + Noel Architects

Facility

New BEQ

Financing

FedGov

Project Scope
  • 78 units
  • 62,300 gsf
  • 4.00 acres
  • Wood Frame
  • Brick
  • Water Source Heat Pump

Dam Neck BEQ

This design-build project consisted of a three-story wood frame building housing 156 sailors in 78 ‘1+1’ modules with an attached semi-circular lounge and two elevators.

Harkins proposed a wood frame building capable of meeting the 110 mph wind loading requirements on a shallow foundation system that was more suited to the generally poor soil conditions present. We provided a number of upgrades that included brick veneer, upgraded metal roofing finish system, nine-foot ceiling height in modules, double layer of drywall on all interior partitions, air-to-air energy recovery system for transfer of energy from exhaust to make-up air, and an accelerated completion schedule.

Also See
Follow Us